Our last big upgrade before Spring Training starts: 600 amp-hours of lithium batteries and 740 watts of solar panels, being installed by the wonderful folks at AM Solar. In-progress shots of the batteries & hybrid inverter below; the panels will start going on soon.

Being installed: Magnum 3000-watt hybrid inverter, and 6 banks of lithium power cells (100 amp-hours each).

Inside AM Solar. The panels are going on next.

Comment